Detailed Table of Contents
Guidance for the item(s) below:
Previously, you learned a number of techniques for specifying requirements. There's one more left, which we'll cover this week.
Use case: A description of a set of sequences of actions, including variants, that a system performs to yield an observable result of value to an actor [ 📖 : ].
A use case describes an interaction between the user and the system for a specific functionality of the system.
Example The main flow of a 'transfer money' use case for an online banking system:
System: Online Banking System (OBS) Use case: UC23 - Transfer Money Actor: User MSS: 1. User chooses to transfer money. 2. OBS requests for details of the transfer. 3. User enters the requested details. 4. OBS requests for confirmation. 5. User confirms. 6. OBS transfers the money and displays the new account balance. Use case ends.
Another Example : 'upload file' use case of an LMS
UML includes a diagram type called use case diagrams that can illustrate use cases of a system visually, providing a visual ‘table of contents’ of the use cases of a system.
In the example on the right, note how use cases are shown as ovals and user roles relevant to each use case are shown as stick figures connected to the corresponding ovals.
Use cases capture the functional requirements of a system.
A use case is an interaction between a system and its actors.
Actors in Use Cases
Actor: An actor (in a use case) is a role played by an external entity, such as a human user or another system.
Example Some actors for a Learning Management System:
A use case can involve multiple actors.
Example A use case involving two actors:
An actor can be involved in many use cases.
Example One actor taking part in several use cases:
A single person/system can play many roles.
Example One person playing several roles:
Many persons/systems can play a single role.
Example Several kinds of persons playing one role:
Use cases can be specified at various levels of detail.
Example Consider the three use cases given below. Clearly, (a) is at a higher level than (b) and (b) is at a higher level than (c).
While modeling user-system interactions,
Writing use case steps
The main body of the use case is a sequence of steps that describes the interaction between the system and the actors. Each step is given as a simple statement describing who does what.
Example The main body of a use case:
A use case describes only the externally visible behavior, not the internal details, of a system. Therefore, it should minimize details that are not part of the interaction between the user and the system.
Example This use case step refers to behavior that is not externally visible (i.e., the user is not meant to be aware of it).
A step gives the intention of the actor (not the mechanics). That means UI details are usually omitted. The idea is to leave as much flexibility to the UI designer as possible. That is, the use case specification should be as general as possible (less specific) about the UI.
Example The first step below is not a good use case step because it contains UI-specific details. The second one is better because it omits UI-specific details.
Bad : User right-clicks the text box and chooses ‘clear’
Good : User clears the input
A use case description can show loops too, using a note that says which steps repeat and what ends the repetition.
Example Adding Steps 2-3 are repeated until the Student selects a valid file. after step 3 of the 'upload file' use case above shows a loop.
The Main Success Scenario (MSS) describes the most straightforward interaction for a given use case, which assumes that nothing goes wrong. This is also called the Basic Course of Action or the Main Flow of Events of a use case.
Example Note how the MSS below assumes that all entered details are correct and ignores problems such as timeouts and network outages. It does not tell us what happens if the user enters incorrect data.
System: Online Banking System (OBS)
Use case: UC23 - Transfer Money
Actor: User
MSS:
Use case ends.
Extensions are "add-ons" to the MSS that describe exceptional/alternative flows of events. They describe variations of the scenario that can happen if certain things are not as expected by the MSS. Extensions appear below the MSS.
Example Some extensions added to the use case in the previous example:
System: Online Banking System (OBS) Use case: UC23 - Transfer Money Actor: User MSS: 1. User chooses to transfer money. 2. OBS requests for details of the transfer. 3. User enters the requested details. 4. OBS requests for confirmation. 5. User confirms. 6. OBS transfers the money and displays the new account balance. Use case ends.
Extensions:
3a. OBS detects an error in the entered data.
3a1. OBS requests for the correct data.
3a2. User enters new data.
Steps 3a1-3a2 are repeated until the data entered are correct.
Use case resumes from step 4.
3b. User requests to schedule the transfer for a future date.
3b1. OBS requests for confirmation.
3b2. User confirms future transfer.
Use case ends.
*a. At any time, User chooses to cancel the transfer.
*a1. OBS requests to confirm the cancellation.
*a2. User confirms the cancellation.
Use case ends.
*b. At any time, 120 seconds lapse without any input from the User.
*b1. OBS cancels the transfer.
*b2. OBS informs the User of the cancellation.
Use case ends.
Note that the numbering style is not a universal rule but a widely used convention. Based on that convention,
3a. and 3b. can happen just after step 3 of the MSS.*a. can happen at any step (hence, the *).When separating extensions from the MSS, keep in mind that the MSS should be self-contained. That is, the MSS should give us a complete usage scenario.
Also note that it is not useful to mention events such as power failures or system crashes as extensions because the system cannot function beyond such catastrophic failures.
In use case diagrams you can use the <<extend>> arrows to show extensions. Note the direction of the arrow is from the extension to the use case it extends and the arrow uses a dashed line.
A use case can include another use case. Underlined text is used to show an inclusion of a use case.
Example This use case includes two other use cases, one in step 1 and one in step 2.
Inclusions are useful,
You use a dotted arrow and an <<include>> annotation to show use case inclusions in a use case diagram. Note how the arrow direction is different from the <<extend>> arrows.

Preconditions specify the state you expect the system to be in before the use case starts.
Example A use case with a precondition:
Software System: Online Banking System
Use case: UC23 - Transfer Money
Actor: User
Preconditions: User is logged in
MSS:
Guarantees specify what the use case promises to give us at the end of its operation.
Example A use case with guarantees:
Software System: Online Banking System
Use case: UC23 - Transfer Money
Actor: User
Preconditions: User is logged in.
Guarantees:
MSS:
Guarantees do for a use case what acceptance criteria do for a user story: they state the observable result that decides whether the interaction did its job, so that 'done' does not have to be argued about afterwards.
You can use actor generalization in use case diagrams using a symbol similar to that of UML notation for inheritance.
Example Actor Blogger can do all the use cases the actor Guest can do, as a result of the actor generalization relationship given in the diagram.

Do not over-complicate use case diagrams by trying to include everything possible. A use case diagram is a brief summary of the use cases that is used as a starting point. Details of the use cases can be given in the use case descriptions.
Some use ‘System’ as an actor to indicate that something is done by the system itself without being initiated by a user or an external system.
Example The diagram below can be used to indicate that the system generates daily reports at midnight.

However, others argue that only use cases providing value to an external user/system should be shown in the use case diagram. For example, they argue that view daily report should be the use case, while generate daily report should not be shown in the use case diagram because it is simply something the system has to do to support the view daily report use case.
You are recommended to follow the latter view (i.e., do not to use System as an actor). Limit use cases to modeling behaviors that involve an external actor.
UML is not very specific about the text contents of a use case. Hence, there are many styles for writing use cases. For example, the steps can be written as a continuous paragraph.
Use cases should be easy to read. Note that there is no strict rule requiring you to write all details of all steps or to use all the elements of a use case.
There are some advantages of documenting system requirements as use cases:
One of the main disadvantages of use cases is that they are not good for capturing requirements that do not involve a user interacting with the system. Hence, they should not be used as the sole means to specify requirements.
Requirements are documented in different formats, each suited to a different purpose. Some examples:
Some teams document requirements in a single document while others may keep different requirements formats in different places, e.g., user stories in a tracker, the glossary in a wiki, and prototypes in a design tool.
Where there is a single document, there are two common variants:
A requirements document explains the problem and the required outcomes, whereas a software specification defines the system's behavior precisely enough to implement and verify it.
Example For a library system:
Some teams put both their requirements and their software specification in one document, while others keep them separate.
Specification-driven development describes an approach that relies heavily on a detailed specification to direct the implementation and to judge the work delivered. The detailed specification serves as a single source of truth for what to build and how to build it. This approach is especially relevant when most of the development work is done by AI agents.
Follow up notes for the item(s) above:
Now that you know all the different ways of specifying requirements, here is an example that shows how all techniques of specifying requirements can work together:
Guidance for the item(s) below:
In the tP, you start with a codebase that already has a certain design. What if there is no such design for you to start with? The next few topics look at how you can come up with such a design yourself.
Design is the creative process of transforming the problem into a solution; the solution is also called design.
-- 📖 Software Engineering Theory and Practice, Shari Lawrence Pfleeger; Joanne M. Atlee
Software design has two main aspects:
Follow up notes for the item(s) above:
Now that you know there are two kinds of 'design', also note that this course focuses more on the internal design rather than the external design.
Multi-level design can be done in a top-down manner, bottom-up manner, or as a mix.
Agile design can be contrasted with full upfront design as follows:
Agile designs are emergent; they are not defined up front. Your overall system design will emerge over time, evolving to fulfill new requirements and take advantage of new technologies as appropriate. Although you will often do some initial architectural modeling at the very beginning of a project, this will be just enough to get your team going. This approach does not produce a fully documented set of models before you can begin coding. -- adapted from agilemodeling.com
Guidance for the item(s) below:
As you do projects, you'll have to make design decisions e.g., decide between multiple design alternatives. Let us learn three fundamental design concepts that you can use in those decisions.
It is extremely important for you to know these three because they are like the DNA of every higher-level design concept.
Abstraction is a technique for dealing with complexity. It works by establishing a level of complexity we are interested in, and suppressing the more complex details below that level.
The guiding principle of abstraction is that only details that are relevant to the current perspective or the task at hand need to be considered. It is the process of hiding complex internal or less relevant details to focus only on essential or more important details. As most programs are written to solve complex problems involving large amounts of intricate details, it is impossible to deal with all these details at the same time. That is where abstraction can help.
Data abstraction: abstracting away the lower level data items and thinking in terms of bigger entities
Example Within a certain software component, you might deal with a user data type, while ignoring the details contained in the user data item such as name and date of birth. These details have been ‘abstracted away’ as they do not affect the task of that software component.
Control abstraction: abstracting away details of the actual control flow to focus on tasks at a higher level
Example print("Hello") is an abstraction of the actual output mechanism within the computer.
Abstraction can be applied repeatedly to obtain progressively higher levels of abstraction.
Example Levels of data abstraction: a File is a data item that is at a higher level than an array, and an array is at a higher level than a bit.
Example Levels of control abstraction: execute(Game) is at a higher level than print(Char), which is at a higher level than an Assembly language instruction MOV.
Abstraction is a general concept that is not limited to just data or control abstractions.
Example More general forms of abstraction:
Coupling is a measure of the degree of dependence between components, classes, methods, etc. Low coupling indicates that a component is less dependent on other components. High coupling (aka tight coupling or strong coupling) is discouraged due to the following disadvantages:
Example Design A appears to have more coupling between the components than design B.
X is coupled to Y if X depends on Y such that some changes to Y may require corresponding changes in X.
Example If the Foo class calls the method Bar#read(), Foo is coupled to Bar because a change to Bar can (but does not always) require a change in the Foo class e.g., if the signature of Bar#read() is changed, Foo needs to change as well, but a change to the Bar#write() method may not require a change in the Foo class because Foo does not call Bar#write().
code for the above example
Example A is coupled to B if:
A has access to the internal structure of B (this results in a very high level of coupling)A and B depend on the same global variableA calls BA receives an object of B as a parameter or a return valueA inherits from BA and B are required to follow the same data format or communication protocolCohesion is a measure of how strongly related and focused the various responsibilities of a component are. A highly cohesive component keeps related functionalities together while keeping out all other unrelated things.
Higher cohesion is better. Disadvantages of low cohesion (aka weak cohesion):
Cohesion can be present in many forms. Some examples:
Student component handles everything related to students.GameArchive component handles everything related to the storage and retrieval of game sessions.Example Suppose a Payroll application contains a class that deals with writing data to the database. If the class includes some code to show an error dialog to the user if the database is unreachable, that class is not cohesive because it seems to be interacting with the user as well as the database.
Guidance for the item(s) below:
In case you are the type who want to become a 'power user' of IDEs (it's not a bad idea, given the IDE is like the primary tool of a software engineer), given below are some more things you can do with IDEs.
Guidance for the item(s) below:
As you start adding new code to the tP, let's also become aware of various approaches in integrating new code to a product.
In terms of timing and frequency, there are two general approaches to integration: late and one-time, and early and frequent.
Late and one-time: wait until all components are completed and integrate all finished components near the end of the project.
This approach is not recommended because integration often causes many component incompatibilities (due to previous miscommunications and misunderstandings) to surface, which can lead to delivery delays i.e., late integration → incompatibilities found → major rework required → cannot meet the delivery date.
Early and frequent: integrate early and evolve each part in parallel, in small steps, re-integrating frequently.
Example A can be written first. This can be done by one developer, possibly the one in charge of integration. After that, all developers can flesh out the skeleton in parallel, adding one feature at a time. After each feature is done, simply integrate the new code into the main system.
Big-bang integration: integrate all (or too many) components at the same time. More generally, it means integrating too many changes at the same time.
Big-bang integration is not recommended because it can uncover too many problems at the same time, which can make debugging and bug-fixing more complex than when problems are uncovered incrementally.
Incremental integration: integrate a few components at a time. More generally, integrating changes gradually. This approach is better than big-bang integration because it surfaces integration problems in a more manageable way.
Guidance for the item(s) below:
Coordinating a team project is not easy. Given below are some very basic tools and techniques that are often used in planning, scheduling, and tracking projects.
A milestone marks significant progress, often at the end of a stage. You should take into account dependencies and priorities when deciding on the features to be delivered at a certain milestone.
Example Each intermediate product release is a milestone.
In some projects, it is not practical to have a very detailed plan for the whole project due to the uncertainty and unavailability of required information. In such cases, you can use a high-level plan for the whole project and a detailed plan for the next few milestones.
Example Milestones for the Minesweeper project, iteration 1:
| Day | Milestones |
|---|---|
| Day 1 | Architecture skeleton completed |
| Day 3 | ‘new game’ feature implemented |
| Day 4 | ‘new game’ feature tested |
A buffer is time set aside to absorb any unforeseen delays. It is very important to include buffers in a software project schedule because effort/time estimations for software development are notoriously hard. However, do not inflate task estimates to create hidden buffers; have explicit buffers instead. Reason: With explicit buffers, it is easier to detect incorrect effort estimates which can serve as feedback to improve future effort estimates.

Keeping track of project tasks (who is doing what, which tasks are ongoing, which tasks are done, etc.) is an essential part of project management. In small projects, it may be possible to keep track of tasks using simple tools such as online spreadsheets or general-purpose/light-weight task tracking tools such as Trello.
Kanban boards provide a simple visual way to track task status. Teams move task cards across columns such as To do, In progress, and Done. This helps the team see the overall flow of work at a glance. A column with many cards can reveal a buildup of work that needs attention. Larger projects may need more sophisticated task tracking tools.
Example A mockup of a Kanban board:
The arrow shows a card moving from To do to In progress when a team member starts working on that task. The initials on a card show who is assigned to that task.
Issue trackers (sometimes called bug trackers) are commonly used to track task assignment and progress. Most online project management software such as GitHub, GitLab, and BitBucket come with an integrated issue tracker. Tools like Jira and Linear are dedicated issue trackers.
Example A screenshot from the Jira Issue tracker software (credit: Atlassian, retrieved on 2026/08):
A Work Breakdown Structure (WBS) is a hierarchical decomposition of the project’s total scope into smaller, manageable pieces of work. When managing projects, it is useful to divide the total work into smaller, well-defined units. Relatively complex tasks can be further split into subtasks. In complex projects, a WBS can also include prerequisite tasks and effort estimates for each task.
Example The high-level tasks for a single iteration of a small project could look like the following:
| Task ID | Task | Estimated Effort | Prerequisite Task |
|---|---|---|---|
| A | Analysis | 1 person day | - |
| B | Design | 2 person day | A |
| C | Implementation | 4.5 person day | B |
| D | Testing | 1 person day | C |
| E | Planning for next version | 1 person day | D |
The effort is traditionally measured in person hour/day/month i.e., work that can be done by one person in one hour/day/month. The Task ID is a label for easy reference to a task. Simple labeling is suitable for a small project, while a more informative labeling system can be adopted for bigger projects.
Example A WBS for a game development project:
| Task ID | Task | Estimated Effort | Prerequisite Task |
|---|---|---|---|
| A | High level design | 1 man day | - |
| B |
Detail design
|
2 man day
| A |
| C |
Implementation
|
4.5 man day
|
|
| D | System Testing | 1 man day | C |
| E | Planning for next version | 1 man day | D |
All tasks should be well-defined. In particular, it should be clear as to when the task will be considered done.
Example Ill-defined tasks and their better-defined counterparts:
| Bad | Better |
|---|---|
| more coding | implement component X |
| do research on UI testing | find a suitable tool for testing the UI |
A Gantt chart is a 2-D bar-chart, drawn as time vs tasks (represented by horizontal bars).
Example A sample Gantt chart:
In a Gantt chart, a solid bar represents the main task, which is generally composed of a number of subtasks, shown as gray bars. The diamond shape indicates an important deadline/deliverable/milestone.
Given below are three commonly used team structures in software development. Irrespective of the team structure, it is a good practice to assign roles and responsibilities to different team members so that someone is clearly in charge of each aspect of the project. In contrast, the ‘everybody is responsible for everything’ approach can result in more chaos and hence slower progress.
Egoless team
In this structure, every team member is equal in terms of responsibility and accountability. When any decision is required, consensus must be reached. This team structure is also known as a democratic team structure. It usually finds a good solution to a relatively hard problem as all team members contribute ideas.
However, the democratic nature of the team structure means it is at a higher risk of falling apart because there is no authority figure to manage the team and resolve conflicts.
Chief programmer team
Frederick Brooks proposed that software engineers learn from the surgical team in an operating room. In such a team, there is always a chief surgeon, assisted by experts in other areas. Similarly, in a chief programmer team structure, there is a single authoritative figure, the chief programmer. Major decisions, e.g., system architecture, are made solely by him/her and obeyed by all other team members. The chief programmer directs and coordinates the effort of other team members. When necessary, the chief will be assisted by domain specialists, e.g., business specialists, database experts, network technology experts, etc. This allows individual group members to concentrate solely on the areas in which they have sound knowledge and expertise.
The success of such a team structure relies heavily on the chief programmer. Not only must he/she be a superb technical hand, he/she also needs good managerial skills. Under a suitably qualified leader, such a team structure is known to produce successful work.
Strict hierarchy team
At the opposite extreme of an egoless team, a strict hierarchy team has a strictly defined organization among the team members, reminiscent of the military or a bureaucratic government. Each team member only works on his/her assigned tasks and reports to a single “boss”.
In a large, resource-intensive, complex project, this could be a good team structure to reduce communication overhead.
See Git-Mastery → Tour 10: Managing Git-Based Projects